
Scope of works
Project overview.
Waterproofing and floor preparation works designed to achieve the required slope and long-term performance.
- Removal of existing wooden frame and marble and disposal of debris.
- Supply and installation of approved matching marble and lights.
- Surface chipping and grinding, moisture removal and screeding.
- Application of PU flexible resin waterproofing and special grout toward drains.